I-10, r. 11 - Regulation respecting the procedure of the professional inspection committee of forest engineers

Full text
4.08. If he has reason to believe that the committee should subject a forest engineer to special inquiry, the investigator shall draw up a verification report and forward it to the committee for study within 15 days following his verification.
R.R.Q., 1981, c. I-10, r. 9, s. 4.08.